| Re: Swindon Ammonium Nitrate Explosive Works,Highworth Branch Posted by Marlburian at 17:06, 18th November 2026 | ![]() ![]() ![]() |
I would have made a lousy bomb aimer relying on aerial photos. It's the splodge at SU16432 86119 just north of where the Highworth branch left the GWR main line.
As you're familiar with with the NLS website, look at the NE corner of this map. this map.
The southern tip of the complex is shown here.
The two oblong buildings and sidings south of the GWR comprise a separate ammunition depot.
And look at that mass of sidings to the west...
| Re: Swindon Ammonium Nitrate Explosive Works,Highworth Branch Posted by Mark A at 11:24, 18th November 2026 | ![]() ![]() ![]() |
maps.nls.uk has a 1945 photo, does that show it? (Also, where is it please?)
https://maps.nls.uk/geo/explore/#zoom=15.4&lat=51.57876&lon=-1.78010&layers=9&b=GoogleSat&o=100
| Re: Swindon Ammonium Nitrate Explosive Works,Highworth Branch Posted by Marlburian at 09:16, 18th November 2026 | ![]() ![]() ![]() |
One photograph shows a pile of waste next to the pool which, the caption says, "looks foul, smelly, and full of sludge".
After the war, Swindon Council was concerned about its effect on the local water course and demanded the Ministry of Munitions act urgently to clear it. A 1958 aerial photograph shows it apparently dried up but not filled in.
| Re: Swindon Ammonium Nitrate Explosive Works,Highworth Branch Posted by Mark A at 09:09, 18th November 2026 | ![]() ![]() ![]() |
| Swindon Ammonium Nitrate Explosive Works,Highworth Branch Posted by Marlburian at 08:50, 18th November 2026 | ![]() ![]() ![]() |
The Railway, Locomotives and History 1916-1919 of the H.M.E.F Stratton, Swindon Ammonium Nitrate Explosive Works by Colin Judge (Industrial Railway Society, 2023) has excellent photographs of the works from the records of the builders, Brunner, Mord & Co Ltd, held at Cheshire Record Office. There are also track plans (some on the small side) and photographs of locomotives and specialist rolling stock.
The site, close to where the Highworth branch left the main GWR line, was selected on December 9, 1916, new track started to be laid on 17th, plans drawn up from the 22nd, tenders invited on the 30th, and a contractor appointed on January 11, 1917. (No doubt some of you will make comparisons with how long new projects take nowadays!) About 3.5 miles of standard-gauge track were laid inside the site. The author notes that some of it had only every other sleeper with spiked nails on the inside of the rails and wooden blocks on the outside.
An aerial ropeway carried sodium sulphate waste to a vile-looking pool.
The site officially closed on April 4, 1919, but remained undeveloped after several failed attempts to sell it off. In the Second World War, a supply depot was set up, utilising the internal railway.
The site closed for good in 1960 and the track lifted.
Some of those photographs would make a modern factory inspector apoplectic. I wonder how many of the 558 female and 882 male workers (as of November 1918) suffered ill-health? Women workers in such factories were often known as "yellow canaries" because of the colour of their skin.














